Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | brownfield, busstop, new, road |
Date time: | 3.53pm, Thursday 22nd April, 2021 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
A new road parallel to Dumbarton Road, connecting Cable Depot Road to the area around Clydebank College. I don't know what bus service they expect will use this road once open completely, since this road effectively bypasses the town centre.
The road has numerous speed humps, but unless there is some form of traffic filtering, has potential to become a rat run. No cycle facilities were noted.
Comments reflect the views of the original submitter only.
* Items marked with an asterisk [*] are required fields and must be fully completed.
A project originating from Cambridge Cycling Campaign // Hosting kindly helped by Mythic Beasts
Short link: https://cycle.st/p167641