Add to Gallery: | Add this photo to a Gallery |
Category: | A place where cyclists will be delayed or need to take extra care, but they can still pass.: Event or temporary issue |
Tags: | access, canal, communitycentre, forthandclydecanal, link, ncn754, new, ramp, resurfaced, steps, surface, underconstruction |
Date time: | 1.10pm, Friday 23rd July, 2021 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Dunbartonshire |
A new steps and ramp access to the canal towpath is being built at the Centre81 community centre in Whitecrook. The towpath here has been resurfaced over a short distance.
Comments reflect the views of the original submitter only.
* Items marked with an asterisk [*] are required fields and must be fully completed.
A project originating from Cambridge Cycling Campaign // Hosting kindly helped by Mythic Beasts
Short link: https://cycle.st/p172438