Donate using PayPal

Tags: underconstruction

You may also be interested in the automatic categorisation listings and themed galleries.

This listing only shows photos within Dunbartonshire.
Go to the national CycleStreets photo listings for photos beyond.

A new canal towpath access point has been created at the Centre81 community centre in Whitecrook. UPDATE: Now open.

A new steps and ramp access to the canal towpath is being built at the Centre81 community centre in Whitecrook. The towpath here has been resurfaced over a short distance.

The new road between Clydebank College and Cable Depot road. This section is as yet unopened, but I saw a few people on bikes using it. At this end, it connects with NCN7. There are bus stops, but no cycle facilities along the road.

A section of new road linking Cable Depot Road to the Clydebank College area. This section is as yet unopened. Here the road is raised to footway level, and corduroy tactiles are used to mark the limit of the carriageway.

A new toucan crossing next to Miller Street. The carriageway has been raised to the same level as the footway, and corduroy tactile paving is used to mark the edge of the footway since the kerb is flush.

Work outside Clydebank Town Hall. No sign yet of the cycle lanes shown in the artist's impression. https://www.scottishconstructionnow.com/article/4-3m-project-to-transform-clydebanks-town-centre-links

We welcome your feedback, especially to report bugs or give us route feedback.

My comments relate to: *






Your comments: *
URL of page: * https://dunbartonshire.cyclestreets.net/photomap/tags/underconstruction/
How did you find out about CycleStreets?:
Your name:
Our ref: Please leave blank - anti-spam measure

* Items marked with an asterisk [*] are required fields and must be fully completed.